Featured Case Study

pipeline-obsolescence-decommissioning

Pipeline Obsolescence: Decommissioning a Branch without Interrupting Flow

HT&P services and a STOPPLE® Train isolation modified for thick-walled pipe were instrumental in taking an obsolete natural gas plant out of service without interrupting product flow to customers.

Results

Total results 15
Single Tap Double Block and Bleed Isolation Cuts Costs of Pipeline Piggability Expansion
Read More
In-line Inspection of Hydrogen­-carrying Pipelines
Read More
EROR Agreements: A Streamlined Approach to Solutions Development
Read More
Preparing Pipelines for Successful In-line Inspection
Read More
36-Inch High Pressure Line Isolation Using Double Block and Bleed Technology
Read More
Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime
Read More