Featured Case Study

pipeline-obsolescence-decommissioning

Pipeline Obsolescence: Decommissioning a Branch without Interrupting Flow

HT&P services and a STOPPLE® Train isolation modified for thick-walled pipe were instrumental in taking an obsolete natural gas plant out of service without interrupting product flow to customers.

Results

Total results 13
EROR Agreements: A Streamlined Approach to Solutions Development
Read More
Preparing Pipelines for Successful In-line Inspection
Read More
36-Inch High Pressure Line Isolation Using Double Block and Bleed Technology
Read More
Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime
Read More
Unique Services Combo, Including SmartPlug® Technology, Enables Safe and Fast Valve Replacement
Read More
High Quality ILI Data from Small Diameter, Low Pressure Pipelines
Read More