Featured Case Study

pipeline-obsolescence-decommissioning

Pipeline Obsolescence: Decommissioning a Branch without Interrupting Flow

HT&P services and a STOPPLE® Train isolation modified for thick-walled pipe were instrumental in taking an obsolete natural gas plant out of service without interrupting product flow to customers.

Results

Total results 13
Prioritization of Mechanical Damage Threats Avoiding Future Failures through Detection, Characterization, Sizing
Read More
36-Inch High Pressure Line Isolation Using Double Block and Bleed Technology
Read More
Assessment of Pipeline Crack and Crack-like Colonies
Read More
Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime
Read More
Unique Services Combo, Including SmartPlug® Technology, Enables Safe and Fast Valve Replacement
Read More
High Quality ILI Data from Small Diameter, Low Pressure Pipelines
Read More