1

Case Study

single-tap-block-and-bleed-isolation

Single Tap Double Block and Bleed Isolation Cuts Costs of Pipeline Piggability Expansion

Tying in a pig launcher and receiver into a transmission system was complicated by the work site’s size and location, along with a tight timetable. Using STOPPLE® Train technology reduces excavation, equipment and labor costs while leaving fewer fittings on the line.