Featured Case Study

Texas-based pipeline - 22 PETROSLEEVES installed

PETROSLEEVE®... the answer for rapid pipeline integrity restoration

TDW Offering: Repair Solution

Technology: PETROSLEEVE® or Type C-sleeve (compression)

Results

Total results 20
Prioritization of Mechanical Damage Threats Avoiding Future Failures through Detection, Characterization, Sizing
Read More
Seam Assessment and Regulatory Compliance: Multiple Datasets+EMAT
Read More
Single Tap Double Block and Bleed Isolation Cuts Costs of Pipeline Piggability Expansion
Read More
In-line Inspection of Hydrogen­-carrying Pipelines
Read More
Preparing Pipelines for Successful In-line Inspection
Read More
36-Inch High Pressure Line Isolation Using Double Block and Bleed Technology
Read More