Video
1551
Case Study: Unique Pipeline Isolation Application During Platform Upgrade in the East China Sea
In this case study video, the isolation solution and the technical expertise of TDW provided multimillion-dollar savings in potential lost production while maintaining safe isolation for more than 80 days to facilitate modification work at the offshore platform. The method involved the deployment of a Dual Module SmartPlug® isolation tool with gas production diverted through a bypass line on the gas export riser during the construction period.