1

Case Study

36in-high-pressure-isolation-double-block-bleed

36-Inch High Pressure Line Isolation Using Double Block and Bleed Technology

TDW uses double block and bleed (DBB) technology to achieve first-time isolation success, enabling a natural gas pipeline operator to tie in a pig launcher and receiver without interrupting service to an entire Canadian island.