Sorry, you need to enable JavaScript to visit this website.

Featured Case Study

pipeline-obsolescence-decommissioning

Pipeline Obsolescence: Decommissioning a Branch without Interrupting Flow

HT&P services and a STOPPLE® Train isolation modified for thick-walled pipe were instrumental in taking an obsolete natural gas plant out of service without interrupting product flow to customers.

Search Case Studies
Category
Industry Type

Results

Total results 12
Prioritization of Mechanical Damage Threats Avoiding Future Failures through Detection, Characterization, Sizing
Read More
Seam Assessment and Regulatory Compliance: Multiple Datasets+EMAT
Read More
36-Inch High Pressure Line Isolation Using Double Block and Bleed Technology
Read More
Assessment of Pipeline Crack and Crack-like Colonies
Read More
Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime
Read More
Preparing Pipelines for Successful In-line Inspection
Read More
TOP