Featured Case Study

pipeline-obsolescence-decommissioning

Pipeline Obsolescence: Decommissioning a Branch without Interrupting Flow

HT&P services and a STOPPLE® Train isolation modified for thick-walled pipe were instrumental in taking an obsolete natural gas plant out of service without interrupting product flow to customers.

Results

Total results 12
Preparing Pipelines for Successful In-line Inspection
Read More
Prioritization of Mechanical Damage Threats Avoiding Future Failures through Detection, Characterization, Sizing
Read More
Seam Assessment and Regulatory Compliance: Multiple Datasets+EMAT
Read More
36-Inch High Pressure Line Isolation Using Double Block and Bleed Technology
Read More
Assessment of Pipeline Crack and Crack-like Colonies
Read More
Valve Replacement: Using Non-Intrusive Isolation Technology to Minimize Production Downtime
Read More