|
|
|
|
|
 |
|
|
| 3.1 Covered Task List |
|
|
This plan currently includes the following covered tasks. The covered tasks were identified by meeting the four part test and by consensus of pipeline operators.
- Hot tapping and plugging
- Abnormal operating conditions General (NCCER)
- Prevention of accidental release of gas
- Composite material wrap
- Launch or receive pipeline pigs and in-line inspection tools
- Maintenance Welding on Pipelines
- Fusing Polyethylene Pipe
|
|
|
|
|
|
|
|